[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1102040":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1102040,779,2,"多选题","设计施工总承包招标与施工招标的不同之处在于（）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","招标文件内容不包括工程量清单.图纸.技术标准及要求等内容",true,{"key":16,"text":17,"correct":14},"B","编制的价格清单包含的内容与施工合同的投标报价的内容有所不同",{"key":19,"text":20,"correct":14},"C","资格审查的审查资料增加了“近年完成的类似设计施工总承包项目情况表”等内容",{"key":22,"text":23,"correct":24},"D","评标办法只包括综合评估法",false,{"key":26,"text":27,"correct":14},"E","投标人须知.评标办法前附表均增加了与设计有关的内容","ABCE","1、编制招标文件 （1）编制根据不同：《标准设计施工总承包招标文件》VS《标准施工招标文件》 （2）招标文件内容不同：",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]