[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1102030":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1102030,779,2,"多选题","采用综合评估法对施工项目投标文件进行详细评审时的内容包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","投标报价",true,{"key":16,"text":17,"correct":18},"B","资格评审",false,{"key":20,"text":21,"correct":18},"C","响应性评审",{"key":23,"text":24,"correct":14},"D","施工组织设计评审",{"key":26,"text":27,"correct":14},"E","项目管理机构评审","ADE","",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]