[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1102028":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1102028,779,2,"多选题","采用最低评标价法对施工项目投标文件进行详细评审时的内容包括()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","形式评审",false,{"key":16,"text":17,"correct":14},"B","施工组织设计",{"key":19,"text":20,"correct":21},"C","付款条件",true,{"key":23,"text":24,"correct":14},"D","项目管理机构",{"key":26,"text":27,"correct":21},"E","单价遗漏","CE","",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]