[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1102024":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},1102024,779,2,"多选题","根据《标准施工招标文件》，评标委员会发现投标文件中的大写金额与小写金额不一致的，正确的处理方式是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","以大写金额为准",true,{"key":16,"text":17,"correct":14},"B","对投标报价进行修正，修正价格须经投标人书面确认",{"key":19,"text":20,"correct":21},"C","直接按投标人的总报价评审，后果由投标人承担",false,{"key":23,"text":24,"correct":21},"D","要求投标人当场重新报价，按新报价评审","AB","2020版教材P54-57 投标文件中的大写金额与小写金额不一致的，以大写金额为准。总价金额与依据单价计算出的结果不一致的，以单价金额为准修正总价，但单价金额小数点有明显错误的除外。",{"id":6,"name":28,"category":29,"favorite":30},"合同管理","建筑工程",0]