[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101970":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1101970,779,2,"多选题","投标人须知中的前附表的内容包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","明确新项目的要求",true,{"key":16,"text":17,"correct":14},"B","招标程序中主要工作步骤的时间安排",{"key":19,"text":20,"correct":21},"C","评标办法",false,{"key":23,"text":24,"correct":14},"D","对投标书的编制要求",{"key":26,"text":27,"correct":21},"E","纪律的监督","ABD","本题考查的是工程施工招标程序。前附表针对招标工程列明正文中的具体要求，明确新项目的要求、招标程序中主要工作步骤的时间安排、对投标书的编制要求等内容。选项CE，属于投标人须知正文部分的内部，不属于前附表内容。",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]