[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101930":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1101930,779,2,"多选题","大型设备的采购，除了交货阶段的工作外，往往还需包括（）和保修等方面的条款约定。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","设备生产制造阶段",true,{"key":16,"text":17,"correct":14},"B","设备安装调试阶段",{"key":19,"text":20,"correct":14},"C","设备试运行阶段",{"key":22,"text":23,"correct":14},"D","设备性能达标检验",{"key":25,"text":26,"correct":27},"E","设备组装检验阶段",false,"ABCD","2020版教材P140-141 大型设备的采购，除了交货阶段的工作外，往往还需包括设备生产制造阶段、设备安装调试阶段、设备试运行阶段、设备性能达标检验和保修等方面的条款约定。",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]