[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101909":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1101909,779,2,"多选题","（2020年真题）根据《标准施工招标文件》中的通用合同条款，关于监理人指示的说法，正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","监理人指示错误给承包人造成的损失应由发包人承担赔偿责任",true,{"key":16,"text":17,"correct":18},"B","监理人根据工程情况变化可以指示免除承包人的部分合同责任",false,{"key":20,"text":21,"correct":14},"C","监理人未按合同约定发出的指示延误导致承包人增加的施工成本应由发包人承担",{"key":23,"text":24,"correct":18},"D","监理人根据工程设计变更指示可以改变承包人的有关合同义务",{"key":26,"text":27,"correct":18},"E","监理人对承包人施工进度计划变更的批准应视为免除承包人工期延误的责任","AC","P91-92 监理人未能按合同约定发出指示、指示延误或指示错误而导致承包人施工成本增加和（或）工期延误，由发包人承担赔偿责任。",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]