[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101908":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1101908,779,2,"多选题","（2020年真题）根据《标准施工招标文件》中的通用合同条款，关于预付款担保金额的说法，正确的有（ ） ．",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","承包人提交的担保金额应与收到的合同约定的预付款金额保持一致",true,{"key":16,"text":17,"correct":14},"B","发包人从工程进度款中已扣除部分预付款后，担保金额可相应递减",{"key":19,"text":20,"correct":21},"C","担保金额在发包人未扣除全部预付款前应高于合同约定的预付款金额",false,{"key":23,"text":24,"correct":21},"D","担保金额不应低于预付款金额减去已向承包人签发的进度款支付证书中扣除的金额",{"key":26,"text":27,"correct":21},"E","担保金额必须保持与剩余预付款额相同","AB","P89-90 担保金额尽管在预付款担保书内填写的数额与合同约定的预付款数额一致，但与履约担保不同，当发包人在工程进度款支付中已扣除部分预付款后，担保金额相应递减。",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]