[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101901":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1101901,779,2,"多选题","(2019年真题)根据《标准施工招标文件》的施工合同文本通用合同条款，可以同时给承包人工期、费用和利润补偿的情形有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","监理人的指示延误",true,{"key":16,"text":17,"correct":18},"B","发包人提供的材料和工程设备提前交货",false,{"key":20,"text":21,"correct":18},"C","异常恶劣的气候条件",{"key":23,"text":24,"correct":18},"D","法规变化引起的价格调整",{"key":26,"text":27,"correct":14},"E","隐蔽工程重新检验质量合格","AE","标准施工合同中应给承包人补偿的条款",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]