[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101866":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1101866,779,2,"多选题","在施工阶段，下列关于工程款支付管理说法错误的有()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","因非承包人原因导致工期顺延，原定竣工日后的支付过程中，调价公式继续有效",false,{"key":16,"text":17,"correct":14},"B","索赔金额属于在通用条款中要求进度付款申请单的内容",{"key":19,"text":20,"correct":14},"C","质量保证金是用于因施工原因修复缺陷工程的开支项目",{"key":22,"text":23,"correct":24},"D","因承包人原因未在约定工期内竣工，后续支付要按照原约定竣工日价格指数",true,{"key":26,"text":27,"correct":24},"E","通用条款规定，监理人出具的进度付款证书，应视为监理人已同意承包人完成的工作","DE","2020版教材P104-107 本题考查的是工程款支付管理。选项D错误，因承包人原因未在约定的工期内竣工，后续支付时应采用原约定竣工日与实际支付日的两个价格指数中，较低的一个作为支付计算的价格指数；选项E错误，通用条款规定，监理人出具的进度付款证书，不应视为监理人已同意、批准或接受了承包人完成的该部分工作。",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]