[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101799":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1101799,779,2,"多选题","施工工程竣工验收合格后，承包人的竣工日为（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","提交竣工验收申请报告日",true,{"key":16,"text":17,"correct":18},"B","有争议时，为提交竣工验收申请报告日",false,{"key":20,"text":21,"correct":18},"C","竣工验收合格日",{"key":23,"text":24,"correct":14},"D","有争议时，为竣工验收合格日",{"key":26,"text":27,"correct":18},"E","签发工程接收证书日","AD","",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]