[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101789":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1101789,779,2,"多选题","缺陷责任期内最终结清的程序包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","承包人提交最终结清申请单",true,{"key":16,"text":17,"correct":14},"B","签发最终结清证书",{"key":19,"text":20,"correct":21},"C","竣工验收",false,{"key":23,"text":24,"correct":14},"D","结清单生效",{"key":26,"text":27,"correct":14},"E","最终支付","ABDE","2020版教材P117-118 本题考核的是缺陷责任期内最终结清的程序。缺陷责任期内最终结清的程序：承包人提交最终结清申请单→签发最终结清证书→最终支付→结清单生效。",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]