[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101724":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1101724,779,2,"多选题","根据《标准施工合同》，工程施工准备阶段承包人应履行的义务有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","收集地下管线资料",false,{"key":16,"text":17,"correct":18},"B","建立专门的质量检查体系",true,{"key":20,"text":21,"correct":18},"C","测施工控制网",{"key":23,"text":24,"correct":14},"D","组织施工图纸会审",{"key":26,"text":27,"correct":18},"E","提交工程开工报审表","BCE","2020版教材P97-98 本题考查的是承包人的义务。(一)现场查勘。(二)编制施工实施计划：1.施工组织设计；2. 质量管理体系；3. 环境保护措施计划。(三)施工现场内的交通道路和临时工程。(四)施工控制网。(五)提出开工申请。选项AD属于发包人的义务。",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]