[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101652":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1101652,779,2,"多选题","勘察人应根据（），按发包人要求的基准点以及合同工程精度要求，进行测绘。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","国家测绘基准",true,{"key":16,"text":17,"correct":14},"B","测绘系统",{"key":19,"text":20,"correct":14},"C","工程测量技术规范",{"key":22,"text":23,"correct":24},"D","施工图纸",false,{"key":26,"text":27,"correct":24},"E","施工组字设计","ABC","2020版教材P78-83 除专用合同条款另有约定外，发包人应在开始勘察前7 日内，向勘察人提供测量基准点、水准点和书面资料等;勘察人应根据国家测绘基准、测绘系统和工程测量技术规范，按发包人要求的基准点以及合同工程精度要求，进行测绘。",{"id":6,"name":31,"category":32,"favorite":33},"合同管理","建筑工程",0]