[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101642":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1101642,779,1,"单选题","如果施工单位项目经理由于工作失误导致采购的材料不能按期到货，施工合同没有按期完成，则建设单位可以要求（ ）承担责任。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工单位",true,{"key":16,"text":17,"correct":18},"B","监理单位",false,{"key":20,"text":21,"correct":18},"C","材料供应商",{"key":23,"text":24,"correct":18},"D","项目经理","知识点:代理关系。项目经理是施工单位的代理人，代理人行为的后果由被代理人施工单位承担。2020版教材P10。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]