[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101569":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1101569,779,1,"单选题","设计施工总承包合同模式下，竣工试验的第三阶段，进行（ ）试验。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","检查和功能性试验",false,{"key":16,"text":17,"correct":14},"B","在所有可利用的操作条件下安全运行",{"key":19,"text":20,"correct":21},"C","各种性能测试",true,{"key":23,"text":24,"correct":14},"D","设备质量检验","知识点:竣工验收管理。选项A是第一阶段；选项B是第二阶段。2020版教材P136。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]