[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101563":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1101563,779,1,"单选题","设计施工总承包合同模式下，以下说法不正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设计文件应由发包人向有关政府部门报送审查",false,{"key":16,"text":17,"correct":18},"B","政府有关部门提出审查意见，发包人必须修改“发包人要求”文件，使之内容与政府审查意见一致",true,{"key":20,"text":21,"correct":14},"C","如审查指出，发包人原要求与法律法规相抵触，发包人应重新提出“发包人要求”文件",{"key":23,"text":24,"correct":14},"D","发包人应在审查同意承包人设计文件后7在内，向政府有关部门报送设计文件","知识点:设计管理。政府有关部门提出审查意见，不需要修改“发包人要求”文件，只需完善设计，承包人按审查意见修改设计文件。2020版教材P128。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]