[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101543":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1101543,779,1,"单选题","依法必须进行招标的货物，自招标文件开始发出之日起至投标人提交投标文件截止之日止，最短不得少于（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","15日",false,{"key":16,"text":17,"correct":18},"B","20日",true,{"key":20,"text":21,"correct":14},"C","30日",{"key":23,"text":24,"correct":14},"D","90日","知识点:材料采购招标文件的编制。依法必须进行招标的货物，自招标文件开始发出之日起至投标人提交投标文件截止之日止，最短不得少于20日。2020版教材P67。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]