[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101530":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1101530,779,1,"单选题","某建设项目开标后，评标委员会发现某投标人的工程量清单中，总价金额和单价与工程量乘积之和的金额不一致。请该投标人澄清时，投标授权人经核算后，认为总价、单价都有错误，遂提出新的单价和总价。该投标书的报价应以（ ）为准。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","原总价",false,{"key":16,"text":17,"correct":18},"B","原单价与工程量乘积之和",true,{"key":20,"text":21,"correct":14},"C","新总价",{"key":23,"text":24,"correct":14},"D","新单价与工程量乘积之和","知识点:综合评估法。投标文体中总价金额与单价金额不一致的，以单价金额为准，属于细微偏差，由评标委员会对投标书中的错误加以修正后请该标书的投标授权人予以签字确认，作为详评比较的依据。2020版教材P59。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]