[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101465":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1101465,779,1,"单选题","某施工合同履行过程中，承包人发现由于公路管理部门的责任，连接施工场地与国道之间的道路不符合招标文件中说明的条件，则承包人由此增加的费用应由（ ）承担。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","公路管理部门",false,{"key":16,"text":17,"correct":14},"B","承包人",{"key":19,"text":20,"correct":21},"C","发包人",true,{"key":23,"text":24,"correct":14},"D","承包人与发包人共同","知识点:发包人义务。开通施工场地与城乡公共道路的通道，保证施工期间的畅通，满足施工运输的需要，属于发包人的义务，由此造成承包人的损失及工期延误应该给予补偿。2020版教材P96。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]