[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101451":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1101451,779,1,"单选题","根据九部委发布的《标准勘察合同》，项目负责人（ ）内不能履行职责的，应事先征得发包人同意，并委派代表代行其职责 。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","24小时",false,{"key":16,"text":17,"correct":18},"B","2天",true,{"key":20,"text":21,"correct":14},"C","3天",{"key":23,"text":24,"correct":14},"D","7天","知识点:项目负责人委托代表的规定。时间是2天。2020版教材P78。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]