[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101083":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1101083,779,1,"单选题","采用工程总承包模式的大型建设工程项目，建设周期三年，其合同计价方式一般采 用（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","固定总价合同",false,{"key":16,"text":17,"correct":14},"B","单价合同",{"key":19,"text":20,"correct":14},"C","成本加酬金合同",{"key":22,"text":23,"correct":24},"D","变动总价合同",true,"在工程施工承包招标时，施工期限一年左右的项目可考虑采用固定总价合同，以签订合同时的单 价和总价为准，物价上涨等风险由承包商承担；对建设周期一年半以上的工程项目，则应考虑施工期间市场价格等 的变化，宜采用可调总价合同",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]