[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101061":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1101061,779,1,"单选题","根据美国AIA标准合同文本，CM承包商提出GMP，GMP的含义是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","管理承包",false,{"key":16,"text":17,"correct":14},"B","合同承包总价",{"key":19,"text":20,"correct":14},"C","风险型CM模式",{"key":22,"text":23,"correct":24},"D","保证工程最大费用",true,"2020版教材P165-166 施工图设计完成后，CM承包商按照最终的工程预算提出保证工程最大费用值（GM2020版教材P）。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]