[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1101018":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1101018,779,1,"单选题","FIDIC系列中，《施工合同条件》中，工程师在收到索赔报告或证明资料后（）天内，或在工程师可能建议并经承包商认可的其他期限内，做出回应。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","7",false,{"key":16,"text":17,"correct":14},"B","14",{"key":19,"text":20,"correct":14},"C","28",{"key":22,"text":23,"correct":24},"D","42",true,"2020版教材P153-157 工程师在收到索赔报告或证明资料后42 天内，或在工程师可能建议并经承包商认可的其他期限内，做出回应。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]