[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100996":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1100996,779,1,"单选题","在设计施工合同履行过程中，由()负责提供原始资料，并承担原始资料错误造成的全部责任。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","发包人",true,{"key":16,"text":17,"correct":18},"B","承包人",false,{"key":20,"text":21,"correct":18},"C","监理人",{"key":23,"text":24,"correct":18},"D","设计人","2020版教材P127 本题考查的是承包人现场查勘。在发包人对提供的施工场地及毗邻区域内的供水、排水、供电、供气、供热、通信、广播电视等地下管线位置的资料;气象和水文观测资料;相邻建筑物和构筑物、地下工程的有关资料，以及其他与建设工程有关的原始资料，承担原始资料错误造成的全部责任。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]