[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100985":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1100985,779,1,"单选题","根据《标准设计施工总承包合同》，对于发包人要求中的错误，正确的处理方式是在订立合同时()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","选用无条件补偿条款或有条件补偿条款",true,{"key":16,"text":17,"correct":18},"B","将无条件补偿条款写入专用条款",false,{"key":20,"text":21,"correct":18},"C","将有条件补偿条款写入专用条款",{"key":23,"text":24,"correct":18},"D","明确复核未发现原始数据错误造成的损失由承包人承担","2020版教材P123-126 本题考查的是订立合同时需要明确的内容。承包人应认真阅读、复核发包人要求，发现错误的，应及时书面通知发包人。发包人对错误的修改，按变更对待。对于发包人要求中错误导致承包人受到损失的后果责任，通用条款给出了两种供选择的条款：无条件补偿条款和有条件补偿条款。由于两个条款的责任不同，应明确本合同采用哪一条款 。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]