[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100974":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1100974,779,1,"单选题","设计施工总承包合同模式下，关于“开始工作通知”说法正确的是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","表明从发出该通知时间开始工作",false,{"key":16,"text":17,"correct":14},"B","与“开工通知”的说法相同",{"key":19,"text":20,"correct":21},"C","表明自该通知中载明的开始工作日期计算合同工期",true,{"key":23,"text":24,"correct":14},"D","该通知是由发包人发出的","2020版教材P127 本题考查的是设计施工总承包合同模式下开始工作。符合专用条款约定的开始工作条件时，监理人获得发包人同意后应提前7天向承包人发出“开始工作通知”。合同工期自开始工作通知中载明的开始工作日期起计算。设计施工总承包合同未用“开工通知”是由于承包人收到开始工作通知后首先开始设计工作。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]