[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100947":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1100947,779,1,"单选题","对于大型工程为了检验承包人的设计、设备造型和运行情况等是否满足合同约定，会在缺陷责任期内工程稳定运行一段时间后，进行竣工后试验。竣工后试验由( )组织，应在试验日期提前( )通知对方。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","承包人或发包人，21天",true,{"key":16,"text":17,"correct":18},"B","发包人，14天",false,{"key":20,"text":21,"correct":18},"C","承包人或发包人，14天",{"key":23,"text":24,"correct":18},"D","承包人，21天","2020版教材P137-138 本题考查的是缺陷责任期管理。对于大型工程为了检验承包人的设计、设备选型和运行情况等的技术指标是否满足合同的约定，通常在缺陷责任期内工程稳定运行一段时间后，在专用条款约定的时间内进行竣工后试验。竣工后试验按专用条款的约定由发包人或承包人进行。发包人或承包人进行竣工试验，均应在竣工后试验的日期提前21天通知对方 。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]