[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100932":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1100932,779,1,"单选题","《设计施工总承包合同》的“价格清单”是指（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","承包人按照发包人提出的工程量清单而计算的报价单",false,{"key":16,"text":17,"correct":14},"B","承包人按发包人的设计图纸概算量，填入单价后计算的合同价格",{"key":19,"text":20,"correct":21},"C","承包人按其提出的投标方案计算的设计、施工、竣工、试运行、缺陷责任期各阶段的计划费用",true,{"key":23,"text":24,"correct":14},"D","承包人向发包人的投标报价","",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]