[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100898":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1100898,779,1,"单选题","工程总承包工程，在分包工程中，发包人同意分包的工作，承包人应向（）提交分包合同副本。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","发包人",false,{"key":16,"text":17,"correct":14},"B","监理人",{"key":19,"text":20,"correct":21},"C","发包人和监理人",true,{"key":23,"text":24,"correct":14},"D","发包人和分包人","2020版教材P120-121 在分包工程中，发包人同意分包的工作，承包人应向发包人和监理人提交分包合同副本。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]