[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100851":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1100851,779,1,"单选题","关于工程设计招标与工程施工招标比较，其特点说法不正确的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设计招标文件中而无具体的工作量",false,{"key":16,"text":17,"correct":18},"B","工程设计招标按规定的工程量清单填报报价后算出总价",true,{"key":20,"text":21,"correct":14},"C","设计招标开标时不按报价高低排定次序",{"key":23,"text":24,"correct":14},"D","设计招标评标委员关注方案的技术先进性、所达到的技术指标、方案的合理性","2020版教材P25-26 在招标条件上，勘察设计招标通常只能向潜在投标人提供项目概况、功能要求等工程前期的初步性基础资料，更多还要依赖投标单位专业设计人员发挥技术专长和创造力，提供智力成果;且无具体量化的工作量，灵活性较大。（B错误）",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]