[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100718":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1100718,779,1,"单选题","在建设工程材料采购招标中，投标人报 EXW价，对该报价理解不正确的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","卖方在其所在地将货物交给买方后即完成交货",false,{"key":16,"text":17,"correct":18},"B","应包括货物运至施工现场的运输费用和保险费",true,{"key":20,"text":21,"correct":14},"C","应包括向政府缴纳的增值税和其他税",{"key":23,"text":24,"correct":14},"D","货物在制造时使用的部件和原材料在从关境外进口时已交纳或应交纳的全部关税、增值税和其他税也应包括在内","",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]