[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100693":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1100693,779,1,"单选题","(2016年真题)根据《标准施工招标文件》，关于综合评估法评标的说法，不正确的有（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","适用于招标人对招标项目的技术、性能有专门要求的招标项目",false,{"key":16,"text":17,"correct":14},"B","评标委员会按照评标办法所列分值构成与评分标准进行打分，按得分从高到低顺序推荐中标人",{"key":19,"text":20,"correct":21},"C","评审的综合评分相等时，投标报价最接近标底的优先",true,{"key":23,"text":24,"correct":14},"D","投标人投标报价明显低于成本，且不能合理说明的，不能成为中标人","本题考查的是综合评估法。综合评分越高越好，按分值高低排序。2020版教材P58。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]