[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100689":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1100689,779,1,"单选题","(2017年真题)最低评标价法对建设工程项目施工投标文件进行评审时，主要比较的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目总报价",false,{"key":16,"text":17,"correct":14},"B","分部分项工程报价",{"key":19,"text":20,"correct":21},"C","对某些量化因素进行价格折算后的总价",true,{"key":23,"text":24,"correct":14},"D","投标人优惠后的总价","本题考查的是最低评标价法。评标委员会按规定的量化因素和标准进行价格折算，计算出评标价并编制价格比较一览表。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]