[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100643":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1100643,779,1,"单选题","下列对于重新招标和不再招标的情形描述错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","投标截止时间止，投标人少于3家应该直接发包",true,{"key":16,"text":17,"correct":18},"B","经评标委员会评审后否决所有投标应当重新招标",false,{"key":20,"text":21,"correct":18},"C","重新投标后，所有投标人又全部被否决的项目可以直接发包",{"key":23,"text":24,"correct":18},"D","重新投标后，投标人仍少于3家的项目可以直接发包","2020版教材P40-49 有下列情形之一的，招标人在分析招标失败的原因并采取相应措施后，应当依法重新招标:投标截止时间止，投标人少于3家；经评标委员会评审后否决所有投标。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]