[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100630":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1100630,779,1,"单选题","投标报价中，总价金额与依据单价计算出的结果不一致的，正确的做法是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","按市场价格调整",false,{"key":16,"text":17,"correct":14},"B","分别修正单价和总价",{"key":19,"text":20,"correct":21},"C","以单价为准调整总价",true,{"key":23,"text":24,"correct":14},"D","以总价为准调整单价","2020版教材P54-57 总价金额与依据单价计算出的结果不一致的，以单价金额为准修正总价，但单价金额小数点有明显错误的除外。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]