[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100609":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1100609,779,1,"单选题","投标报价偏差率的计算公式为( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","(投标人报价—评标基准价)／评标基准价×100％",true,{"key":16,"text":17,"correct":18},"B","(投标人报价—标底)／标底×100％",false,{"key":20,"text":21,"correct":18},"C","(投标人报价—最高限价)／最高限价×100％",{"key":23,"text":24,"correct":18},"D","(投标人报价—评标基准价)／投标人报价×100％","2020版教材P57-59 本题考查的是综合评估法。投标报价偏差率的计算公式为：(投标人报价-评标基准价)／评标基准价×100％。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]