[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100606":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1100606,779,1,"单选题","某工程招标失败，招标人分析招标失败的原因并采取相应措施的后，需要重新进行招标的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","投标截止时间，投标人少于3个",true,{"key":16,"text":17,"correct":18},"B","属于必须审批工程建设项目，经原审批部门批准",false,{"key":20,"text":21,"correct":18},"C","重新招标后投标人仍少于3个",{"key":23,"text":24,"correct":18},"D","重新招标后所有投标被否决","2020版教材P45 本题考查的是重新招标。某工程招标失败，招标人分析招标失败的原因并采取相应措施后，需要重新进行招标的是：投标截止时间，投标人少于3个；经评标委员会评审会否决所有投标的。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]