[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100594":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1100594,779,1,"单选题","下列关于施工邀请招标有关工作先后顺序的说法中，正确的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","发布招标公告、开标、审查投标人资格",false,{"key":16,"text":17,"correct":18},"B","发出投标邀请书、开标、审查投标人资格",true,{"key":20,"text":21,"correct":14},"C","发布招标公告、审查投标人资格、发售招标文件",{"key":23,"text":24,"correct":14},"D","审查投标人资格、发出投标邀请书、发售招标文件","2020版教材P39 本题考查的是招标方式。本题要求的是邀请招标，故不需要发布招标公告和设置资格预审程序。 由于于对邀请对象的基本情况和能力有一定的了解，一般采用资格后审。如果公开招标前预计可能响应投标的人数较少，为了保证投标的竞争性和参与投标的人数在3家以上，也可以采用资格后审。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]