[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100590":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1100590,779,1,"单选题","采用综合评估法对施工项目投标文件进行详细评审时，属于项目管理机构评审内容的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目经理的任职资格",true,{"key":16,"text":17,"correct":18},"B","施工方案与技术措施的合理性",false,{"key":20,"text":21,"correct":18},"C","资源配置计划的合理性",{"key":23,"text":24,"correct":18},"D","工程进度计划与措施的科学性和合理性","",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]