[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100584":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1100584,779,1,"单选题","采用综合评估法对施工项目投标文件进行详细评审时，属于施工组织设计评审内容的是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目经理的任职资格",false,{"key":16,"text":17,"correct":14},"B","主要技术负责人的施工管理业绩",{"key":19,"text":20,"correct":14},"C","各专业人员数量的合理性",{"key":22,"text":23,"correct":24},"D","资源配置计划的合理性",true,"",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]