[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100408":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1100408,779,1,"单选题","（2020年真题）根据《标准施工招标文件》中的通用合同条款，监理人征得发包人同意后，应提前（ ）日向承包人发出开工通知。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","7",true,{"key":16,"text":17,"correct":18},"B","10",false,{"key":20,"text":21,"correct":18},"C","14",{"key":23,"text":24,"correct":18},"D","15","P98-99 监理人征得发包人同意后，应在开工日期7天前向承包人发出开工通知，合同工期自开工通知中载明的开工日起计算。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]