[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100286":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1100286,779,1,"单选题","在一个施工现场有甲、乙两个独立承包人同时施工，由于施工出现交叉干扰，致使甲、乙分别受到一定损失，总监理工程师向甲发出了暂停施工指令，则（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","甲、乙都应向发包人索赔",true,{"key":16,"text":17,"correct":18},"B","甲、乙分别承担对方的损失",false,{"key":20,"text":21,"correct":18},"C","甲、乙分别承担各自的损失",{"key":23,"text":24,"correct":18},"D","甲的损失由发包人承担，乙的损失自行承担","2020版教材P91 本题考查的是监理人的指示。如果监理人给的指示错误或失误给承包人造成的损失，由发包人承担赔偿责任。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]