[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100248":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1100248,779,1,"单选题","对于可能发生的变更，下列关于监理人指示变更的说法正确的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","不需征求承包人意见",false,{"key":16,"text":17,"correct":14},"B","承包人收到变更意向书后应当同意实施变更",{"key":19,"text":20,"correct":14},"C","承包人同意实施变更的，监理人应当发出变更指示",{"key":22,"text":23,"correct":24},"D","经发包人同意后发出变更指示",true,"",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]