[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100220":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1100220,779,1,"单选题","某施工合同履行过程中，承包人因自身原因造成实际工程进度滞后计划进度，按照工程师要求对进度计划进行了修改，并得到工程师的确认。但执行修改后的进度计划，仍不能按期完工。下列关于该拖期的处理方法中，正确的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","追究承包人拖期违约责任时，减少合同约定的日拖期赔偿金额",false,{"key":16,"text":17,"correct":14},"B","工程师对确认进度计划负责，承担部分拖期完工违约金",{"key":19,"text":20,"correct":21},"C","承包人按合同约定的拖期违约金的计算办法承担违约责任",true,{"key":23,"text":24,"correct":14},"D","按照修改后的进度计划确认新的合同工期，不视为拖期完工","本题考查的是施工进度管理。监理人对进度计划提出修改意见以及审查，并不改变承包人责任。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]