[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100184":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1100184,779,1,"单选题","在合同履行过程中，由于发包人提供的图纸设计错误，导致承包人施工放线返工，则应（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","仅补偿承包人费用，不补偿利润",false,{"key":16,"text":17,"correct":14},"B","既不补偿承包人费用，也不补偿利润",{"key":19,"text":20,"correct":21},"C","既补偿承包人费用，又补偿利润",true,{"key":23,"text":24,"correct":14},"D","仅补偿利润部分，不补偿承包人费用","属于发包人应予控制而未做好的情况，则应补偿费用和合理利润。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]