[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100128":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1100128,779,1,"单选题","发包人应及时完成施工场地的征用、移民、拆迁工作并按时移交，关于施工场地的移交说法正确的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","可以一次移交完成，也可以分次移交",true,{"key":16,"text":17,"correct":18},"B","只能一次移交完成，不可以分次移交",false,{"key":20,"text":21,"correct":18},"C","只能分次移交完成，不可以一次移交",{"key":23,"text":24,"correct":18},"D","以不影响单位工程的施工为原则","",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]