[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100116":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1100116,779,1,"单选题","订立施工合同时通用条款规定的基准日期指投标截止时间前（ ）天，规定基准日期的作用是划分该日后由于政策法规的变化或市场物价浮动对合同价格影响的责任。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","21",false,{"key":16,"text":17,"correct":14},"B","24",{"key":19,"text":20,"correct":21},"C","28",true,{"key":23,"text":24,"correct":14},"D","30","2020版教材P93-95 通用条款规定的基准日期指投标截止时间前28天。规定基准日期的作用是划分该日后由于政策法规的变化或市场物价浮动对合同价格影响的责任。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]