[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100100":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1100100,779,1,"单选题","根据《标准施工合同》，承包人需要变动保险合同条款时，正确的处理方式是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","直接与保险人协商一致后，通知发包人",false,{"key":16,"text":17,"correct":14},"B","直接与保险人协商一致后，通知监理人",{"key":19,"text":20,"correct":21},"C","应事先征得发包人同意，并通知监理人",true,{"key":23,"text":24,"correct":14},"D","应事先征得监理人同意，并通知发包人","2020版教材P95-96 本题考查的是明确保险责任。承包人需要变动保险合同条款时，应事先征得发包人同意，并通知监理人。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]