[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100051":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1100051,779,1,"单选题","勘察人应按合同协议书的约定指派项目负责人，并在约定的期限内到职，项目负责人（）天内不能履行职责的，应事先征得发包人同意，并委派代表代行其职责。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1",false,{"key":16,"text":17,"correct":18},"B","2",true,{"key":20,"text":21,"correct":14},"C","3",{"key":23,"text":24,"correct":14},"D","7","2020版教材P78-83 项目负责人2 天内不能履行职责的，应事先征得发包人同意，并委派代表代行其职责。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]